Computer cluster: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
The HPC infrastructure at the Animal Breeding and Genomics Centre is currently in a transition phase. Over the past years the main infrastructure consisted of the [[Lx6_and_Lx7_compute_nodes | Lx6 and Lx7 compute nodes]]. As of December 2013 the new [[B4F_cluster | B4F cluster]] has become online is expected to replace the old infrastructure early 2014. The Lx6 and Lx7 compute nodes, attached to a 100TB storage facility, will remain online for the foreseeable future (expectation mid-2014). | |||
[[ | |||
Latest revision as of 00:39, 23 November 2013
The HPC infrastructure at the Animal Breeding and Genomics Centre is currently in a transition phase. Over the past years the main infrastructure consisted of the Lx6 and Lx7 compute nodes. As of December 2013 the new B4F cluster has become online is expected to replace the old infrastructure early 2014. The Lx6 and Lx7 compute nodes, attached to a 100TB storage facility, will remain online for the foreseeable future (expectation mid-2014).